Maxus eDeliver 3
Electric Commercial · China Motors
List price for the base version, checked on 2 Nov 2026 · עמוד הדגם של היבואן · All prices include VAT · Prices may change and may contain mistakes. Confirm with the importer before you buy.
- Rangeup to 238 km
- Battery50.2 kWh
- Fast-charging powerup to 50 kW
- Home chargingup to 7 kW
Full specs
Main specs · base version
- Usable battery
- 50.2 kWh
- WLTP range
- 238 km
- WLTP consumption
- 21.1 kWh per 100 km
- Connectors
- CCS2 · Type 2
- V2L (power devices from the car)
- Being checked
Battery and power figures are still to be checked against the importer's spec sheet.
Versions and prices
- L1H1 Van קצר238 km · 50.2 kWh · DC 50 kW₪199,800
- Van ארוך228 km · 50.2 kWh · DC 50 kW₪209,900
List prices include VAT, before the licensing fee.
Charging cost by network · base version
EV Edge · Fast off-peak1.73 shekels per kilowatt hour₪1.73 per kWh₪38
Gnrgy · Fast2.20 shekels per kilowatt hour₪2.20 per kWh₪46
ZEN Energy · Fast2.65 shekels per kilowatt hour₪2.65 per kWh₪56- Home charging0.64 shekels per kilowatt hour₪0.64 per kWh₪13
Per 100 km, based on WLTP consumption, including the connection fee (a 35 kWh session). Real consumption depends on the weather and how you drive.
Charging and costs
What a charge costs
Maxus eDeliver 3, 35.1 kWh. At home on the household rate of ₪0.64 a kWh. At a station: the cheapest fast charger right now (EV Edge), connection fee included, no membership.
Chargers for this carCharging speed
- Fast charging 10%→80%
- 53 min
- Peak fast-charging power
- 50 kW
- Range added in 10 minutes of fast charging
- about 30 km
- Peak slow-charging power
- 7 kW
- Slow charging 0%→100%
- about 7 h
Deals and quotes
Deals on this model
No deals on this model right now.
Maxus eDeliver 3 | Maxus eDeliver 5 Combi | Maxus eDeliver 5 |
|---|---|---|
| Pricefrom ₪199,800 | Pricefrom ₪184,990 | Pricefrom ₪179,990 |
| Range (WLTP)up to 238 km | Range (WLTP)up to 338 km | Range (WLTP)up to 339 km |
| Battery50.2 kWh | Battery64 kWh | Battery64 kWh |
| Fast charging50 kW | Fast charging70 kW | Fast charging70 kW |
| Fast charge 10–80%≈ 53 min | Fast charge 10–80%≈ 49 min | Fast charge 10–80%≈ 49 min |
| Cost 10–80%At the cheapest fast charger right now, connection fee included≈ ₪33 | Cost 10–80%At the cheapest fast charger right now, connection fee included≈ ₪43 | Cost 10–80%At the cheapest fast charger right now, connection fee included≈ ₪43 |
| Charging cost per 100 km₪46 | Charging cost per 100 km₪42 | Charging cost per 100 km₪42 |
| Charging cost per year · 15,000 km₪6,961 | Charging cost per year · 15,000 km₪6,249 | Charging cost per year · 15,000 km₪6,230 |
| ImporterChina Motors | ImporterAuto Chen | ImporterAuto Chen (Belilius Group) |
best value in the row · list prices · cost per 100 km and per year at ₪2.20 per kWh, a typical fast-charger price · the 10–80% charge at the cheapest fast charger right now
Photos are for illustration only. Prices are the importers' list prices including VAT, may change and may contain mistakes.


